Procedure with the overhead conductor rails at Shaw's Cove Railroad Bridge in Connecticut In a very movable bridge that takes advantage of a rigid overhead rail, there is a have to transition in the catenary wire method into an overhead conductor rail in the bridge portal (the last traction present pylon before the movable bridge). For instance, th